Run your model in Melbourne or in your own data centre

Melbourne needs no hardware from you, and your own data centre, connected or air-gapped, keeps the traffic on your network.

You can run your model in three places. In our Melbourne facility, your people reach it over an encrypted link. In your data centre on a network, it runs on your hardware and only the updates you approve come in. Air-gapped, it has no network connection, and updates arrive as signed artefacts delivered offline.
Where your model runs
Hardware
We supply it, in our Melbourne facility.You supply anything from one multi-GPU node to a full rack, or we build a cluster to our reference design and hand it over.
Your data
It stays in your instance in Australia, and no other customer’s model trains on it.It stays on your network, with no route from us to your traffic.
Updates
A new version goes live only when you approve it.Signed artefacts arrive offline, with release notes, evaluation results and a rollback.

Wherever it runs

You keep the same four controls in each option.

They hold in Melbourne, in your own rack and in a room with no network.

  • You hold the weights.

    You hold them under the base model’s licence, and they leave with you.

  • You approve each version.

    A new version goes live only after you approve it.

  • Your sign-in and your records.

    Staff sign in through your identity provider, and history, metering and the audit trail stay in your instance.

  • Australian law, in the contract.

    We’re Australian-owned with no foreign parent, and the contract puts your data under Australian law.

Rollout

Five steps from scoping to operation.

We run it as an infrastructure project, paced by your change board and your assessors.

  1. 01

    Scope

    We agree the task, its security classification and the hardware you already have.

  2. 02

    Design

    We draw up a reference architecture covering model sizes, node counts, network and identity.

  3. 03

    Install

    We install it with your platform team, through your change process.

  4. 04

    Accredit

    We supply the evidence pack and sit with your assessors.

  5. 05

    Operate

    We benchmark each update before it ships, release it on your schedule, and give you a named engineer to call.

Scoping

Tell us the task, and which data has to stay on your own infrastructure.